Engineering Cost Estimate

The engineering cost estimates were produced based on the amount of hours spent on each individual task. Renee Schneider was given a Project Engineer/Team Leader position and Robert Szargowicz was given the title of Senior Staff Engineer. The structural and transportation advisors were given engineering director roles.