{"id":123,"date":"2025-05-01T15:22:35","date_gmt":"2025-05-01T15:22:35","guid":{"rendered":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/?page_id=123"},"modified":"2025-05-19T13:42:15","modified_gmt":"2025-05-19T13:42:15","slug":"spring-semester-update","status":"publish","type":"page","link":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/spring-semester-update\/","title":{"rendered":"Spring Semester Update"},"content":{"rendered":"\n<p>The American Society of Civil Engineers (ASCE) Concrete Canoe Competition challenged students to design and fabricate a canoe out of concrete which was raced at the 2025 Metropolitan Regional Competition at White Meadow Lake in Rockaway, NJ on April 27th. The design of the canoe had to follow the material restrictions presented by the Committee on Concrete Canoe Competitions. The material restrictions were a minimum of 35% aggregates by volume, maximum cement by mass of 50%, and maximum hydrated lime by mass of 15%. The 2025 TCNJ team sought to focus on three aspects: materials design, constructability, and quality of the final product. The hull was designed using Freeship software accounting for a flat bottom profile with a length of 16 feet, beam of 2.5 feet, and depth of 1.75 feet. A structural analysis was completed to find the minimum required compressive and tensile strengths as 13 psi and 14 psi, respectively. The designed mix achieved a 28-day compressive strength of 1600 psi and a unit weight of 59 pcf. A male mold was constructed using \u00be\u201d plywood ribs and 1\/5\u201d underlayment cut into 1\u201d and 2\u201d strips. The engineering cost and service for the fall semester was $25,600, and the engineering cost and service for the spring semester was $35,000 for a total engineering cost of $60,600. The construction cost for the project was $2,950. Races were not held due to inclement weather, but the team made it to the competition, passed the swamp test, and placed 5<sup>th<\/sup> overall.&nbsp;<\/p>\n\n\n\n<p>During the spring semester our team fabricated the canoe according to our design from the fall. The spring semester started with creating a base table to place the mold on and then the mold was created.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"618\" height=\"772\" src=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image.png\" alt=\"The fully prepared canoe mold sitting on a wooden table. Foam was shaped in order to make the ends of the canoe taper in the desired way. The center of the mold is wood that was covered in spackle and painted a dark gray. \" class=\"wp-image-124\" srcset=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image.png 618w, https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-240x300.png 240w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><figcaption class=\"wp-element-caption\">Canoe Mold Pre-Cast<\/figcaption><\/figure>\n\n\n\n<p>After the mold was ready for casting, the canoe was placed using two layers of our designed mix, with a layer of fiberglass mesh reinforcement in the middle. With the assistance of our fellow classmates, the canoe was constructed and the curing process began.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"627\" height=\"776\" src=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-1.png\" alt=\"The canoe mold post cast. It remains on the wooden table, but is now covered in light gray concrete.\" class=\"wp-image-126\" srcset=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-1.png 627w, https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-1-242x300.png 242w\" sizes=\"auto, (max-width: 627px) 100vw, 627px\" \/><figcaption class=\"wp-element-caption\">Canoe Post-Cast<\/figcaption><\/figure>\n\n\n\n<p>Burlap, bi-daily watering cycles, and humidifiers were used to ensure that the canoe had proper hydration. Plastic tarps were also utilized to ensure the moisture stayed within the canoe. Curing lasted 21 days until the canoe was removed from the mold, and then continued for 7 more days after to complete the full 28-day curing cycle.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"806\" src=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-2.png\" alt=\"The canoe mold covered with plastic tarp. \" class=\"wp-image-128\" srcset=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-2.png 612w, https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-2-228x300.png 228w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><figcaption class=\"wp-element-caption\">Curing Process<\/figcaption><\/figure>\n\n\n\n<p>Transportation planning begun on how the canoe was going to arrive at White Meadow Lake. A cradle was made out of wood and bungee cords to absorb any shock during the trip, and was reinforced with bubble wrap and pool noodles to protect the canoe.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"717\" src=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-3.png\" alt=\"The UHAUL loaded and ready for transport. In the back of the photo, the canoe stands are located. Extending from the back of the truck to the forefront of the image is a cradle that was build to hold the canoe during transportation. The canoe is settled into the cradle and covered with a cargo net in order to secure it. Pool noodles and bubble wrap are attached to the ccanoe in orer to protect it during transport. In the foreground of the photo (to the right) is the cross section of the canoe. It has a yellow pool noodle on the side to protect it during transportation and is wrapped in orange bubble wrap. Blue ratchet straps run from the left of the image to the right and are used to secure the canoe. \" class=\"wp-image-129\" srcset=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-3.png 612w, https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-3-256x300.png 256w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><figcaption class=\"wp-element-caption\">Canoe on Cradle for Transportation<\/figcaption><\/figure>\n\n\n\n<p>During the competition, our canoe performed exceptionally well in the swamp test, but unfortunately no races were held due to inclement weather. Our team plans to reuse the canoe for next years competition.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"648\" src=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-4.png\" alt=\"The Hail Mary on the water during the swamp test. Team members (from left to right) Ethan Earley, Anthony Giorgi, Olivier Duverneau, and Rachel Alecci surround the canoe. Anthony and Olivier both hold orange buckets. \" class=\"wp-image-130\" srcset=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-4.png 612w, https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/image-4-283x300.png 283w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><figcaption class=\"wp-element-caption\">Swamp Test<\/figcaption><\/figure>\n\n\n\n<p>A link to our presentation can be found below.<\/p>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"http:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/Concrete-Canoe-Spring-Services.pptx-1-compressed.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of Concrete Canoe - Spring Services.pptx (1)-compressed.\"><\/object><a id=\"wp-block-file--media-76f340c5-938f-48de-afdc-0cc9494618ca\" href=\"http:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/Concrete-Canoe-Spring-Services.pptx-1-compressed.pdf\">Concrete Canoe &#8211; Spring Services.pptx (1)-compressed<\/a><a href=\"http:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-content\/uploads\/sites\/270\/2025\/05\/Concrete-Canoe-Spring-Services.pptx-1-compressed.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-76f340c5-938f-48de-afdc-0cc9494618ca\">Download<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The American Society of Civil Engineers (ASCE) Concrete Canoe Competition challenged students to design and fabricate a canoe out of concrete which was raced at the 2025 Metropolitan Regional Competition at White Meadow Lake in Rockaway, NJ on April 27th. The design of the canoe had to follow the material restrictions presented by the Committee &hellip; <a href=\"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/spring-semester-update\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Spring Semester Update<\/span><\/a><\/p>\n","protected":false},"author":578,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-123","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-json\/wp\/v2\/pages\/123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-json\/wp\/v2\/users\/578"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-json\/wp\/v2\/comments?post=123"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-json\/wp\/v2\/pages\/123\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/2025concretecanoe\/wp-json\/wp\/v2\/media?parent=123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}