{"id":110,"date":"2024-12-04T00:43:45","date_gmt":"2024-12-04T00:43:45","guid":{"rendered":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/?page_id=110"},"modified":"2025-05-14T05:42:00","modified_gmt":"2025-05-14T05:42:00","slug":"fall-semester-update","status":"publish","type":"page","link":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/fall-semester-update\/","title":{"rendered":"Fall Semester Update"},"content":{"rendered":"\n<p>This project focused on the redesign of hydraulic and transportation components along County Road Route 626\/Lomason&#8217;s Glen Road and Bridge No. 23073 (the culvert) over Buckhorn Creek Tributary in White Township, New Jersey. A large storm event in 2022 caused total road failure downstream of the culvert, and sections of the roadway collapsed on the tributary side of Lomason&#8217;s Glen Road, resulting in road closure. The project focus is to improve scour protection along the embankments, redesigning the culvert to prevent overtopping, and a roundabout design. Gabion baskets were selected for scour due to their affordability, lower environmental impact, and less maintenance than a levee wall. The runoff volume was calculated using a curve number of 0.3, drainage area of 1.13 square miles, and a rainfall intensity of 3 in\/hr, resulting in an estimated peak flow 100 cfs. For the culvert redesign, a rectangular open-bottom culvert was favored for its higher flow rate and preserving ecological balance over a closed bottom culvert. For the traffic design, a roundabout was considered at Belvidere Road &amp; Lomason\u2019s Glen Road. With a peak hour traffic flow of 862 vehicles and a 50 mph speed limit on Belvidere Road, a roundabout was selected for that intersection to calm traffic flow and improve safety. Altering the roadway geometry to add pedestrian\/bicycle lanes was considered, but due to spatial constraints, increasing existing signage and reevaluating sight distance is more crucial. The estimated fall and spring engineering service costs were $23,000 and $25,000 respectively.<\/p>\n\n\n\n<p>Below is a link to the Fall Semester Engineering Services Proposal Presentation-<\/p>\n\n\n\n<p><a href=\"http:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-content\/uploads\/sites\/272\/2025\/05\/Engineering-Services-Proposal-Presentation-County-Route-626-.pptx.pdf\" data-type=\"link\" data-id=\"http:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-content\/uploads\/sites\/272\/2025\/05\/Engineering-Services-Proposal-Presentation-County-Route-626-.pptx.pdf\">http:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-content\/uploads\/sites\/272\/2025\/05\/Engineering-Services-Proposal-Presentation-County-Route-626-.pptx.pdf<\/a><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This project focused on the redesign of hydraulic and transportation components along County Road Route 626\/Lomason&#8217;s Glen Road and Bridge No. 23073 (the culvert) over Buckhorn Creek Tributary in White Township, New Jersey. A large storm event in 2022 caused total road failure downstream of the culvert, and sections of the roadway collapsed on the &hellip; <a href=\"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/fall-semester-update\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Fall Semester Update<\/span><\/a><\/p>\n","protected":false},"author":580,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-110","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-json\/wp\/v2\/pages\/110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-json\/wp\/v2\/users\/580"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-json\/wp\/v2\/comments?post=110"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-json\/wp\/v2\/pages\/110\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/2025rt626rehab\/wp-json\/wp\/v2\/media?parent=110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}