{"id":64,"date":"2024-12-03T20:25:58","date_gmt":"2024-12-03T20:25:58","guid":{"rendered":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/?page_id=64"},"modified":"2025-05-14T01:19:05","modified_gmt":"2025-05-14T01:19:05","slug":"fall-semester-update","status":"publish","type":"page","link":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/fall-semester-update\/","title":{"rendered":"Fall Semester Update"},"content":{"rendered":"\n<p><strong><a href=\"http:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2025\/05\/Final-Fall-Presentation-Felsenstein-Hengey-DiRienzo.pdf\">Engineering Services Presentation<\/a><\/strong><\/p>\n\n\n\n<p>The Ocean Drive\/Route 152 corridor between northern Ocean City, New Jersey, and Longport, New Jersey is both inadequately and inefficiently designed. This corridor facilitates heavy shore traffic and is not conducive to pedestrian and cyclist use. This project consists solely of transportation work. <\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"441\" height=\"516\" src=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-4.png\" alt=\"\" class=\"wp-image-77\" style=\"width:311px;height:auto\" srcset=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-4.png 441w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-4-256x300.png 256w\" sizes=\"auto, (max-width: 441px) 100vw, 441px\" \/><figcaption class=\"wp-element-caption\">The total project, with each possible site marked<\/figcaption><\/figure><\/div>\n\n\n<p>Alternative 1 encompasses a redesign of the JFK Memorial Bridge\/Longport intersection, the Ocean City\/Ocean Drive Bridge intersection, the expansion of the Longport Dog Beach parking lot, the improvement of the Dog Beach parking lot crosswalk, and the restriping of the entire corridor.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"490\" height=\"507\" src=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-1.png\" alt=\"\" class=\"wp-image-74\" style=\"width:381px;height:auto\" srcset=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-1.png 490w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-1-290x300.png 290w\" sizes=\"auto, (max-width: 490px) 100vw, 490px\" \/><figcaption class=\"wp-element-caption\">Focuses of Alternative 1<\/figcaption><\/figure><\/div>\n\n\n<p>Alternative 2 disregards the Ocean City\/Ocean Drive Bridge intersection while Alternative 3 disregards the JFK Memorial Bridge\/Longport intersection.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"501\" height=\"406\" src=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-2.png\" alt=\"\" class=\"wp-image-75\" style=\"width:501px;height:auto\" srcset=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-2.png 501w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-2-300x243.png 300w\" sizes=\"auto, (max-width: 501px) 100vw, 501px\" \/><figcaption class=\"wp-element-caption\">Focuses of Alternative 2<\/figcaption><\/figure><\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"302\" height=\"217\" src=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-3.png\" alt=\"\" class=\"wp-image-76\" style=\"width:499px;height:auto\" srcset=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-3.png 302w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-3-300x216.png 300w\" sizes=\"auto, (max-width: 302px) 100vw, 302px\" \/><figcaption class=\"wp-element-caption\">Alternative 3&#8217;s difference, being the Ocean City intersection<\/figcaption><\/figure><\/div>\n\n\n<p>Alternative 2 is the most effective alternative because it has a balanced split of overall project necessity and safety improvements, while Alternatives 1 and 3 redesigned the Ocean City\/Ocean Drive Bridge intersection that was deemed unnecessary. Design and realistic constraints such as the project\u2019s close proximity to sea level and the environmental effects of construction were considered when determining the most effective alternative.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"814\" height=\"520\" src=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-5.png\" alt=\"\" class=\"wp-image-78\" style=\"width:618px;height:auto\" srcset=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-5.png 814w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-5-300x192.png 300w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-5-768x491.png 768w\" sizes=\"auto, (max-width: 814px) 100vw, 814px\" \/><figcaption class=\"wp-element-caption\">Representation of each sites&#8217; proximity to sea level<\/figcaption><\/figure><\/div>\n\n\n<p>The historical traffic count data for the entire corridor was obtained using existing NJDOT counts, which showed an average daily peak volume of about 870 vehicles. This data was analyzed in conjunction with manual traffic counts taken during site visits. <\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"927\" height=\"644\" src=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-6.png\" alt=\"\" class=\"wp-image-79\" style=\"width:561px;height:auto\" srcset=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-6.png 927w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-6-300x208.png 300w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-6-768x534.png 768w\" sizes=\"auto, (max-width: 927px) 100vw, 927px\" \/><figcaption class=\"wp-element-caption\">Graph of vehicle volumes taken on Ocean Drive by the NJDOT during the off-season<\/figcaption><\/figure><\/div>\n\n\n<p>The intersection and dog beach parking lot will be designed in accordance with AASHTO, NJDOT, and ADA standards and specifications. The estimated engineering costs for the fall semester amount to $24,000.00. The estimated engineering costs for the spring semester will likely be similar, at an amount of $25,000.00.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"772\" height=\"470\" src=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-7.png\" alt=\"\" class=\"wp-image-80\" style=\"width:591px;height:auto\" srcset=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-7.png 772w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-7-300x183.png 300w, https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-content\/uploads\/sites\/288\/2024\/12\/image-7-768x468.png 768w\" sizes=\"auto, (max-width: 772px) 100vw, 772px\" \/><figcaption class=\"wp-element-caption\">Fall engineering costs<\/figcaption><\/figure><\/div>","protected":false},"excerpt":{"rendered":"<p>Engineering Services Presentation The Ocean Drive\/Route 152 corridor between northern Ocean City, New Jersey, and Longport, New Jersey is both inadequately and inefficiently designed. This corridor facilitates heavy shore traffic and is not conducive to pedestrian and cyclist use. This project consists solely of transportation work. Alternative 1 encompasses a redesign of the JFK Memorial &hellip; <a href=\"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/fall-semester-update\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Fall Semester Update<\/span><\/a><\/p>\n","protected":false},"author":642,"featured_media":0,"parent":0,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-64","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-json\/wp\/v2\/pages\/64","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-json\/wp\/v2\/users\/642"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-json\/wp\/v2\/comments?post=64"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-json\/wp\/v2\/pages\/64\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/abseconoceancity\/wp-json\/wp\/v2\/media?parent=64"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}