Updates

  • Met with Joe Zanetti to discuss constraints and expectations when using the TCNJ Machine Shop for building a prototype
  • Website created and updated regularly
  • Established requirements and began researching specifications
  • Presented proposal and requirements to both Biomedical and Mechanical Engineering faculty/peers
  • Began sketching preliminary design ideas
  • Early stages of budgeting
  • Met with Brian Wittreich to discuss the details associated with 3D printing
  • Finalized specifications
  • Preparing to present a preliminary design to the Mechanical and Biomedical departments
  • Began CAD drawings and simulation for base socket and exterior adjustment mechanism
  • Presented preliminary design to Mechanical and Biomedical department
  • Finalized budget
  • Added new four requirements and associated specifications for the pressure sensing system
  • Began researching sensor systems
  • Finishing up CAD drawings for base socket and adjustment mechanism
  • Continued preliminary Ansys Simulations
  • Began SP1 final report
  • Prepared for SP1 final presentation
  • Presented SP1 final presentation to Mechanical and Biomedical Engineering Departments
  • Finalized SP1 final report
  • Well deserved break!
  • Team bonding activities!
  • Created a timeline for the semester ahead
  • Began ordering materials
  • Wrote preliminary verification protocols for all requirements
  • Test printed certain components of the device for proof of concept/ fitting purposes
  • Finalized simulations on the base socket
  • Began simulations on the components of the adjustment mechanism
  • Submitted abstract to Northeastern Bioengineering Conference (NEBEC)
  • Test printed final socket geometry
  • Manufactured HDPE bands
  • Preparing for final socket print in Onyx
  • Wrote verification and validation protocols, and preparing necessary materials
  • Presented progress to the Biomedical Engineering department