The construction of our mold for the canoe began as soon as we all arrived back from winter break. The cross sections were cut in the woodshop and to connect them, we used decorative paneling. The tips of the canoe were created by shaving a block Styrofoam into the correct shape. Once the mold was complete, our team spent 10 hours in the lab, mixing and spraying the canoe with the concrete. Pictures of the construction process can be found in the gallery.