Final Steps

Our team is finalizing our presentation for the oral section of the competition which will take place Friday at NJIT. Our physical race will be held in Denville this Saturday. We have finalized everything for our display table including our poster to present at the competition on “How to make a concrete canoe”. This week we have created a 3 foot cross section of the canoe to show our construction process and the different layers of the canoe.

Final Steps

Our competition is about two weeks away! Our team has created a stand for the canoe to be place on. Once the stand was built, we could remove the canoe from the mold. Our canoe was successfully removed from our mold! We created one last concrete mix and touched up some patches and smoothed the edges of the canoe. We are currently creating a display for the canoe and posters to explain our design and building process at the competition.