Results from Site Visit – Location of Proposed Roundabout

A traffic count was also taken at the existing intersection of Tunison Boulevard and Tower Center Boulevard. This is the location of the proposed roundabout. The count was performed on Thursday, February 16th, between 4:45pm and 5:45pm.