As can be seen in the table above, the construction cost for each component was calculated. Using the table, it was found that total construction cost would be $518,000. It was also found that the time for construction would be six to seven months.
Monthly Archives: May 2017
Construction Cost Estimate and Schedule
Pavement Design
For the purpose of this corridor, the pavement was designed such that one uniform pavement design could be used throughout the bounds of the project. The pavement design was completed using the Marshall method as described in the Mannering and Washburn textbook, and based on the traffic count data provided by the NJDOT. By performing this analysis, it was found that the optimal design consists of five inches of hot mix asphalt, five inches of coarse soil cement, and eleven inches of crushed stone.