{"id":204,"date":"2017-03-28T16:47:45","date_gmt":"2017-03-28T16:47:45","guid":{"rendered":"https:\/\/route18redesign17.pages.tcnj.edu\/?p=204"},"modified":"2017-03-28T16:47:45","modified_gmt":"2017-03-28T16:47:45","slug":"finalized-designs","status":"publish","type":"post","link":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/2017\/03\/28\/finalized-designs\/","title":{"rendered":"Finalized Designs"},"content":{"rendered":"<p>The design for the Route 18 Corridor Improvements has been finalized, with snapshots of\u00a0two areas of improvement shown below. The proposed turnaround ramp connecting Route 18 Northbound to Route 18 Southbound is seen on the bottom left, while the entrance ramp to the NJ Turnpike is shown on the bottom right.<\/p>\n<p><a href=\"http:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/Turnaround.png\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-206 alignnone\" src=\"http:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/Turnaround-300x178.png\" alt=\"\" width=\"248\" height=\"147\" srcset=\"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/Turnaround-300x178.png 300w, https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/Turnaround-768x457.png 768w, https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/Turnaround-1024x609.png 1024w, https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/Turnaround.png 1316w\" sizes=\"auto, (max-width: 248px) 100vw, 248px\" \/><\/a>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <a href=\"http:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/NJTPK-Ramp.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205\" src=\"http:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/NJTPK-Ramp-300x142.png\" alt=\"\" width=\"300\" height=\"142\" srcset=\"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/NJTPK-Ramp-300x142.png 300w, https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/NJTPK-Ramp-768x364.png 768w, https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/NJTPK-Ramp-1024x485.png 1024w, https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-content\/uploads\/sites\/58\/2017\/03\/NJTPK-Ramp.png 1294w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The design for the Route 18 Corridor Improvements has been finalized, with snapshots of\u00a0two areas of improvement shown below. The proposed turnaround ramp connecting Route 18 Northbound to Route 18 Southbound is seen on the bottom left, while the entrance ramp to the NJ Turnpike is shown on the bottom right. \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &nbsp;<\/p>\n","protected":false},"author":93,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-204","post","type-post","status-publish","format-standard","hentry","category-updates"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/posts\/204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/users\/93"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/comments?post=204"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/posts\/204\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/media?parent=204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/categories?post=204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/corridorredesign17\/wp-json\/wp\/v2\/tags?post=204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}