As of 2/9/21, the complete frame materials have been received, along with numerous pieces for the drivetrain and steering systems. The team has begun manufacturing on all three of these systems, using tools such as the lathe, milling machine, drill press, mig welder, and more! Check out the “Photos” page for some manufacturing snapshots!
