{"id":91,"date":"2021-02-10T18:09:18","date_gmt":"2021-02-10T18:09:18","guid":{"rendered":"http:\/\/engprojects.tcnj.edu\/hpvc-21\/?p=91"},"modified":"2021-02-10T18:11:20","modified_gmt":"2021-02-10T18:11:20","slug":"manufacturing-begins","status":"publish","type":"post","link":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/2021\/02\/10\/manufacturing-begins\/","title":{"rendered":"Manufacturing Begins&#8230;"},"content":{"rendered":"\n<p>As of 2\/9\/21, the complete frame materials have been received, along with numerous pieces for the drivetrain and steering systems. The team has begun manufacturing on all three of these systems, using tools such as the lathe, milling machine, drill press, mig welder, and more! Check out the &#8220;Photos&#8221; page for some manufacturing snapshots!<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-content\/uploads\/sites\/173\/2021\/02\/manufaturing-967x1024.jpg\" alt=\"\" class=\"wp-image-92\" width=\"507\" height=\"537\" srcset=\"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-content\/uploads\/sites\/173\/2021\/02\/manufaturing-967x1024.jpg 967w, https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-content\/uploads\/sites\/173\/2021\/02\/manufaturing-283x300.jpg 283w, https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-content\/uploads\/sites\/173\/2021\/02\/manufaturing-768x814.jpg 768w, https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-content\/uploads\/sites\/173\/2021\/02\/manufaturing-1450x1536.jpg 1450w, https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-content\/uploads\/sites\/173\/2021\/02\/manufaturing-1933x2048.jpg 1933w, https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-content\/uploads\/sites\/173\/2021\/02\/manufaturing-1200x1271.jpg 1200w\" sizes=\"auto, (max-width: 507px) 85vw, 507px\" \/><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>As of 2\/9\/21, the complete frame materials have been received, along with numerous pieces for the drivetrain and steering systems. The team has begun manufacturing on all three of these systems, using tools such as the lathe, milling machine, drill press, mig welder, and more! Check out the &#8220;Photos&#8221; page for some manufacturing snapshots!<\/p>\n","protected":false},"author":342,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-91","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/posts\/91","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/users\/342"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/comments?post=91"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/posts\/91\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/media?parent=91"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/categories?post=91"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/hpvc-21\/wp-json\/wp\/v2\/tags?post=91"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}