{"id":226,"date":"2016-03-21T15:52:10","date_gmt":"2016-03-21T15:52:10","guid":{"rendered":"https:\/\/ma14bridge.pages.tcnj.edu\/?p=226"},"modified":"2016-03-21T15:52:10","modified_gmt":"2016-03-21T15:52:10","slug":"bridge-shape","status":"publish","type":"post","link":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/2016\/03\/21\/bridge-shape\/","title":{"rendered":"Bridge Shape"},"content":{"rendered":"<p>With the inputs finished into HEC-RAS, the minimum height of 12&#8242; above high tide was kept.\u00a0 The mean sea level is 0&#8242;, plus the high tide at 7&#8242;.\u00a0 This puts the low chord of the bridge at 19&#8242;.\u00a0 Even though the current model shows a pile design, the pile design is not complete.\u00a0 Once a pile design is selected it can be inputted into HEC-RAS and the scour can be ran on the model.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-content\/uploads\/sites\/84\/2016\/03\/Brige-shape-with-old-piles.jpg\" rel=\"attachment wp-att-227\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-227\" src=\"http:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-content\/uploads\/sites\/84\/2016\/03\/Brige-shape-with-old-piles-300x148.jpg\" alt=\"Brige shape with old piles\" width=\"300\" height=\"148\" srcset=\"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-content\/uploads\/sites\/84\/2016\/03\/Brige-shape-with-old-piles-300x148.jpg 300w, https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-content\/uploads\/sites\/84\/2016\/03\/Brige-shape-with-old-piles-768x379.jpg 768w, https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-content\/uploads\/sites\/84\/2016\/03\/Brige-shape-with-old-piles-1024x505.jpg 1024w, https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-content\/uploads\/sites\/84\/2016\/03\/Brige-shape-with-old-piles.jpg 1614w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the inputs finished into HEC-RAS, the minimum height of 12&#8242; above high tide was kept.\u00a0 The mean sea level is 0&#8242;, plus the high tide at 7&#8242;.\u00a0 This puts the low chord of the bridge at 19&#8242;.\u00a0 Even though the current model shows a pile design, the pile design is not complete.\u00a0 Once a &hellip; <a href=\"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/2016\/03\/21\/bridge-shape\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Bridge Shape<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":131,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-226","post","type-post","status-publish","format-standard","hentry","category-updates"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/posts\/226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/users\/131"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/comments?post=226"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/posts\/226\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/media?parent=226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/categories?post=226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/monmouthbridge16\/wp-json\/wp\/v2\/tags?post=226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}