{"id":107,"date":"2017-11-06T20:08:55","date_gmt":"2017-11-06T20:08:55","guid":{"rendered":"https:\/\/parkinglotavailability18.pages.tcnj.edu\/?p=107"},"modified":"2017-11-06T20:08:55","modified_gmt":"2017-11-06T20:08:55","slug":"base-station-prototype-1","status":"publish","type":"post","link":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/2017\/11\/06\/base-station-prototype-1\/","title":{"rendered":"Base Station (EVT)"},"content":{"rendered":"<h2>Progress<\/h2>\n<p>As of November 8, 2017, the Base Station is at the Evaluation Validation Testing stage. The hardware specifications are defined and the prototype is assembled and ready for initial testing in Late February.<\/p>\n<p>The <a href=\"https:\/\/parkinglotavailability18.pages.tcnj.edu\/?page_id=83\" target=\"_blank\" rel=\"noopener\">Base Station\u00a0product page<\/a> has been updated with more technical details.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Progress As of November 8, 2017, the Base Station is at the Evaluation Validation Testing stage. The hardware specifications are defined and the prototype is assembled and ready for initial testing in Late February. The Base Station\u00a0product page has been updated with more technical details.<\/p>\n","protected":false},"author":54,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-107","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/posts\/107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/users\/54"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/comments?post=107"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/posts\/107\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/media?parent=107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/categories?post=107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/parkinglotavailability18\/wp-json\/wp\/v2\/tags?post=107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}