{"id":165,"date":"2015-09-02T19:21:41","date_gmt":"2015-09-02T19:21:41","guid":{"rendered":"http:\/\/engineeringseniorproject.pages.tcnj.edu\/?p=1"},"modified":"2015-09-02T19:21:41","modified_gmt":"2015-09-02T19:21:41","slug":"hello-world-2","status":"publish","type":"post","link":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/2015\/09\/02\/hello-world-2\/","title":{"rendered":"Brief Overview:"},"content":{"rendered":"<p>This year&#8217;s grade A team of seniors is comprised of Szymon Saniewski (Captain), Marc Leotta, and Jack Eelman.<\/p>\n<p><a href=\"http:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-content\/uploads\/sites\/34\/2015\/09\/Overview-Pic-1.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-77\" src=\"http:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-content\/uploads\/sites\/34\/2015\/09\/Overview-Pic-1-300x224.png\" alt=\"\" width=\"300\" height=\"224\" srcset=\"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-content\/uploads\/sites\/34\/2015\/09\/Overview-Pic-1-300x224.png 300w, https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-content\/uploads\/sites\/34\/2015\/09\/Overview-Pic-1-768x574.png 768w, https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-content\/uploads\/sites\/34\/2015\/09\/Overview-Pic-1.png 892w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Our Senior Project is the redesign of Princeton Pike at Shabakunk Creek. In short the plan is to:<\/p>\n<ul>\n<li>Perform hydraulic analysis of area, focusing on 100 year return period to derive peak flow and hydrograph and create a hydraulic model to analyze the bridge.<\/li>\n<li>Provide traffic calming measures to make Princeton Pike a more pedestrian friendly roadway by redesigning nearby intersections at Irwin Place and Gainsboro Road.<\/li>\n<li>Conduct a vertical realignment of approaching roadway to bridge at Shabakunk Creek<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>This year&#8217;s grade A team of seniors is comprised of Szymon Saniewski (Captain), Marc Leotta, and Jack Eelman. Our Senior Project is the redesign of Princeton Pike at Shabakunk Creek. In short the plan is to: Perform hydraulic analysis of area, focusing on 100 year return period to derive peak flow and hydrograph and create &hellip; <a href=\"https:\/\/engprojects.tcnj.edu\/princetonpike18\/2015\/09\/02\/hello-world-2\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Brief Overview:<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-165","post","type-post","status-publish","format-standard","hentry","category-updates"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/posts\/165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/comments?post=165"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/posts\/165\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/media?parent=165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/categories?post=165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/princetonpike18\/wp-json\/wp\/v2\/tags?post=165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}