Timeline

Spring 2025

Brainstormed potential projects and decided on a rehabilitation device to improve at-home physical therapy adherence.

September 2025

Developed initial design inputs, constraints, and standards.

October 2025

Develop design solutions, budget, and determine safety training needed to complete the project.

November 2025

Finalize design, develop hazard and risk analysis. Draft verification and validation protocols.

December 2025

Continue prototyping and purchasing materials