{"id":63,"date":"2015-09-08T00:56:04","date_gmt":"2015-09-08T00:56:04","guid":{"rendered":"http:\/\/engineeringseniorproject.pages.tcnj.edu\/?page_id=63"},"modified":"2015-09-08T00:56:04","modified_gmt":"2015-09-08T00:56:04","slug":"project-component-1","status":"publish","type":"page","link":"https:\/\/engprojects.tcnj.edu\/solarboat16\/project\/project-component-1\/","title":{"rendered":"Electrical System\/Telemetry"},"content":{"rendered":"<p>The 2016 team is currently working on an basic electrical system in order to get the boat dynamically tested before winter arrives. \u00a0After testing and mechanical redesign, the team will return to the electrical system to make improvements such as a dead-man switch (required for competition), a bypass (to switch between endurance and sprint configurations), and finally a telemetry system. \u00a0Telemetry is important in the endurance portion of the competition, allowing the captain to maintain an optimal speed. \u00a0 \u00a0<a href=\"http:\/\/engprojects.tcnj.edu\/solarboat16\/wp-content\/uploads\/sites\/93\/2015\/09\/Screen-Shot-2015-09-15-at-8.46.03-PM.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-76\" src=\"http:\/\/engprojects.tcnj.edu\/solarboat16\/wp-content\/uploads\/sites\/93\/2015\/09\/Screen-Shot-2015-09-15-at-8.46.03-PM-300x229.png\" alt=\"Schematic the team is currently working off of\" width=\"300\" height=\"229\" srcset=\"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-content\/uploads\/sites\/93\/2015\/09\/Screen-Shot-2015-09-15-at-8.46.03-PM-300x229.png 300w, https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-content\/uploads\/sites\/93\/2015\/09\/Screen-Shot-2015-09-15-at-8.46.03-PM.png 525w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Schematic the team is currently working off of<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 2016 team is currently working on an basic electrical system in order to get the boat dynamically tested before winter arrives. \u00a0After testing and mechanical redesign, the team will return to the electrical system to make improvements such as a dead-man switch (required for competition), a bypass (to switch between endurance and sprint configurations), &hellip; <a href=\"https:\/\/engprojects.tcnj.edu\/solarboat16\/project\/project-component-1\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Electrical System\/Telemetry<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":10,"featured_media":0,"parent":45,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-63","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-json\/wp\/v2\/pages\/63","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-json\/wp\/v2\/comments?post=63"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-json\/wp\/v2\/pages\/63\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-json\/wp\/v2\/pages\/45"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/solarboat16\/wp-json\/wp\/v2\/media?parent=63"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}