Monthly Archives: September 2016

First Update!

image (6)  image (3)  image (4)

The 2017 Steel Bridge Team is getting things started for the semester! We reassembled the bridge from 2016 and have been analyzing the trusses, connections, and lateral support system. We have some really solid design ideas to build from, and lots of room to improve and redesign the less successful aspects of the bridge. Our next goal is to create several design alternatives and test them using finite element analysis software.