The bridge is painted! The team selected a matte black for the outer members and a metallic gold for the lateral bracing and inner support members. Additionally, the team developed a marking system to indicate which members connect to each other, and where they belong within the overall structure of the bridge. The marking system is pictured below:
The team also constructed and attached a name place to the bridge as required by the competition specifications.
Finally, the team has been practicing the construction process in order to minimize the time of construction for the competition. The sequencing has been tweaked a variety of times in order to maximize the use of the piers and the efficiency of each builder.