September 2025
- Requirements
- Design Inputs
- Website Created
- Team Contract Created
- Project Constraints
October 2025
- Project Standards and Guidelines
- Initial Budget Sheet
- Gantt Chart
- Safety Survey
- Interim Design Review
- Design Verification and Solutions
November 2025
- Hazard Analysis
- Project Abstract
- SolidWorks Drawings and Initial Frame Model
- Decisions for Functional Components
- Motor, MCU, Tensioning Element, Materials, etc.
December 2025
- Created more finalized SolidWorks models for the phase 2 shell based on updated design specs and drawings.
- Found and acquired new parts and materials for the project
- Final Design Review
- Review of New Design models/drawings as well as testing methods
- Developed full Scope design Verification and Validation Methods
- Began to use OpenSim for the implemenation of design to measure actuation torques