{"id":94,"date":"2023-10-18T14:40:35","date_gmt":"2023-10-18T14:40:35","guid":{"rendered":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/?page_id=94"},"modified":"2024-05-01T21:45:08","modified_gmt":"2024-05-01T21:45:08","slug":"progress","status":"publish","type":"page","link":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/progress\/","title":{"rendered":"Progress"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">September Updates<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\">Week 1 (September 3-9): <\/td><td>Requirements for the device were created to start understanding device design.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Week 2 (September 10-16): <\/td><td>Website to showcase device development was made.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Week 3 (September 17-23):<\/td><td>Machine shop meeting occurred to understand parts manufacturing.<br>Device requirements were redesigned and specifications for the requirements were created.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Week 4 (September 24-30):<\/td><td>Realistic constraints for the device were created.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">October Updates<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Week 5 (October 1-7):<\/td><td><a href=\"https:\/\/docs.google.com\/spreadsheets\/d\/12Duay4T5KaSsdepypm1AMffiZlwSVnTbiMbjOpWpm4w\/edit#gid=838643852\">Budget<\/a> began to be worked on to start looking at parts necessary to order or start purchasing.<\/td><\/tr><tr><td>Week 6 (October 8-14):<\/td><td>Standards for the device were created.<\/td><\/tr><tr><td>Week 7 (October 15-21):<\/td><td>A <a href=\"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/wp-content\/uploads\/sites\/248\/2023\/10\/Screen-Shot-2023-10-19-at-10.02.06-AM-1024x640.png\">gantt chart<\/a> was created to provide a general timeline for the device creation and project assignments.<\/td><\/tr><tr><td>Week 8 (October 22-28):<\/td><td>Interim Presentation was created<br>Design inputs were updated and refined<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">November Updates<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Week 9 (October 29-November 4)<\/td><td>Interim Presentation was presented and feedback was integrated into project design.<\/td><\/tr><tr><td>Week 10 (November 5-11)<\/td><td>Final report began to be worked on<br>Verification and Validation activities were created<\/td><\/tr><tr><td>Week 11 (November 12-18)<\/td><td>Triad Spectral Sensor and SPO2 Sensor were ordered<br>Ardiunos were experimented with and code began to be written.<\/td><\/tr><tr><td>Week 12 (November 19-25)<\/td><td>Project algorithm was created and patient testing began to be generated.<\/td><\/tr><tr><td>Week 13 (November 26-December 2)<\/td><td>Went over final report and final presentation makeup and criteria.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">December\/January<\/h2>\n\n\n\n<p>During winter break research into verification and validation methods were completed along with design considerations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">February Updates<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Week 1 (January 28th &#8211; February 3rd)<\/td><td>Verification activities were discussed and testing protocols began to be created<\/td><\/tr><tr><td>Week 2 (February 4th -February 10th)<\/td><td>Validation activities were discussed and testing protocols began to be created<\/td><\/tr><tr><td>Week 3 (February 11- February 17th)<\/td><td>Verification activities were began.<\/td><\/tr><tr><td>Week 4 (February 18th &#8211; February 24th)<\/td><td>Verification activities were continued in addition to some validation activities beginning.<\/td><\/tr><tr><td>Week 5 (February 25th &#8211; March 2nd)<\/td><td>Final code for project was adjusted to accommodate all devices connected.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">March Updates<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Week 6 (March 3rd &#8211; March 9th)<\/td><td>Code was addition worked on and verification and validation activities continued.<\/td><\/tr><tr><td>Week 7 (March 10th &#8211; March 16th)<\/td><td>Week of spring break so team members worked separately from their homes.<\/td><\/tr><tr><td>Week 8 (March 17th &#8211; March 23rd)<\/td><td>New <a href=\"\/\/\/Users\/chasemiller\/Desktop\/Screenshot%202024-04-15%20at%204.58.59%E2%80%AFPM.png\" target=\"_blank\" rel=\"noreferrer noopener\">gantt chart<\/a> was created to keep track on semester long activities and keep team on track.<\/td><\/tr><tr><td>Week 9 (March 24th &#8211; March 30th)<\/td><td>NEBEC posted was created and design was beginning and information was beginning to be created.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">April Updates<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Week 10 (March 31st &#8211; April 6th)<\/td><td>Final preparations for NEBEC conference in addition to final poster touchups were done.<\/td><\/tr><tr><td>Week 11 (April 7th &#8211; April 13th)<\/td><td>Final project design was created and final parts were being permanently glued shut.<\/td><\/tr><tr><td>Week 12 (April 14th &#8211; April 20th)<\/td><td>Additional validation tested was conducted<\/td><\/tr><tr><td>Week 13 (April 21st &#8211; April 27th)<\/td><td>Final design was completed in addition to any additional testing data<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>September Updates Week 1 (September 3-9): Requirements for the device were created to start understanding device design. Week 2 (September 10-16): Website to showcase device development was made. Week 3 (September 17-23): Machine shop meeting occurred to understand parts manufacturing.Device requirements were redesigned and specifications for the requirements were created. Week 4 (September 24-30): Realistic &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/progress\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Progress&#8221;<\/span><\/a><\/p>\n","protected":false},"author":493,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-94","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/wp-json\/wp\/v2\/pages\/94","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/wp-json\/wp\/v2\/users\/493"}],"replies":[{"embeddable":true,"href":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/wp-json\/wp\/v2\/comments?post=94"}],"version-history":[{"count":0,"href":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/wp-json\/wp\/v2\/pages\/94\/revisions"}],"wp:attachment":[{"href":"https:\/\/engprojects.tcnj.edu\/stspulseoximeter\/wp-json\/wp\/v2\/media?parent=94"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}