Design Selection Update

The alternative truss designs have been tested in Visual Analysis software for deflection and self-weight. Based on the results, the team estimated the competition score for each bridge to determine the most efficient design. Alternative design 3 was selected. A Gantt chart and preliminary budget were created to track the progress of the project. The next step is to determine the support and lateral bracing design.