BRIDGE DESIGN UPDATE

Alternative designs for the truss have been completed. Each design meets specifications based on the dimension constraints of the competition. A design chosen by the team will be analyzed using visual analysis to determine the truss’ performance under lateral and vertical loads within the next week. The designs were produced based on research of past designs from previous competitions.

Alternative Design 1:

LARGEXAlternative Design 2:

DIAGAlternative Design 3:

X5