August 16, 2018Uncategorizedwebmaster

Welcome to Your SUPER-powered WP Engine Multisite Install. This is your first post. Edit or delete it, then start blogging!

One comment so far

Open Sourced

April 24, 2018UncategorizedWarren Seto

Open Source!

As of Late April 2018, this project is officially open sourced.

All assets, CAD files, and source code, used in this project is opened sourced at this URL: https://github.com/nextseto/Parking-Lot-Occupancy

Detection Unit (PVT)

April 24, 2018UncategorizedWarren Seto

Progress

As of April 23, 2018, the Detection Unit is at the Production Validation Testing stage. All communication between it and the Base Station are ready for on-the-ground deployment testing.

Base Station (PVT)

April 24, 2018UncategorizedWarren Seto

Progress

As of April 23, 2018, the Base Station is at the Production Validation Testing stage. All communication between it and the Amazon Backend are ready for on-the-ground deployment testing.

Amazon Backend (PVT)

February 28, 2018UncategorizedWarren Seto

Progress

As of March 1, 2018, the Amazon Backend is at the Production Validation Testing stage. All endpoints and REST APIs are ready for the Base Station and end-users on-the-ground deployment testing in March.

The Amazon Backend product page has been updated with more technical details.

Amazon Backend (EVT)

November 8, 2017UncategorizedWarren Seto

Progress

As of November 8, 2017, the Amazon Backend is at the Evaluation Validation Testing stage. All the technical details are implemented and is ready for initial testing in Late February.

The Amazon Backend product page has been updated with more technical details.

Detection Unit (EVT)

November 6, 2017UncategorizedWarren Seto

Progress

As of November 8, 2017, the Detection Unit is at the Evaluation Validation Testing stage. The hardware specifications are defined and the prototype is being assembled and ready for initial testing in Late February.

The Detection Unit product page has been updated with more technical details.

Base Station (EVT)

November 6, 2017UncategorizedWarren Seto

Progress

As of November 8, 2017, the Base Station is at the Evaluation Validation Testing stage. The hardware specifications are defined and the prototype is assembled and ready for initial testing in Late February.

The Base Station product page has been updated with more technical details.

Recent Posts

  • Hello world!
  • Open Sourced
  • Detection Unit (PVT)
  • Base Station (PVT)
  • Amazon Backend (PVT)

Recent Comments

  • A WordPress Commenter on Hello world!

Archives

  • August 2018
  • April 2018
  • February 2018
  • November 2017

Categories

  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
TCNJ Logo

© Copyright    2000 Pennington Road Ewing, NJ 08628-0718