Preliminary Mix Design – Mission Accomplished!

We prepared our preliminary mix design using the measurements listed under Mix Design. Nine mortar cubes were filled with this mixture, and were covered for 24 hours before they were placed in water to cure for the next 28 days. Our mix was successful, the cubes floated!

MixDesign1a    MixDesign1b      MixDesign1cMixDesign1f     MixDesign1d      MixDesign1h