Final Bridge Design April 30, 2018UncategorizedJack Eelman An analysis of the new bridge design shows that when considering the energy grade line elevation of 10.76 ft and the lower chord elevation of 11.1 ft the bridge will no longer be impacted by a 100 yr 24 hr rain event.