Today the team met to finish each individual intersection in AutoCAD. The existing conditions were included in the CAD drawings, which included lane striping, lane division, crosswalks and concrete islands. Dimensions were taken out at each intersection to ensure the CAD drawings of the existing intersection were accurate.
Monthly Archives: October 2015
Roadway Dimension Collection
We drove down to Parkway Avenue and measured the dimensions of four out of the five intersections, excluding N. Olden Ave, to help us produce a more accurate CAD drawing. N. Olden Ave will be measured with the assistance of Robert Vallee, from Vallee Surveying, and his state of the art surveying equipment.
Website Construction
Met up with group to work on team website. Focused on bios and specific responsibilities of each member.
Acquired Measuring Equipment
We spoke with Dr. Brennan and he was nice enough to let us use a single measuring wheel for our project. We will go out into the field this weekend, weather permitting, and take all the necessary measurements of the existing site conditions. This will aid us when drawing the roadway and intersections on Auto-CAD.