Monthly Archives: March 2016

Poster

The team got together to work on the final poster for the project. The data that was crucial to the project was added since there was only a limited amount of space supplied. An overview of the problem was added, the motivation, and graphical information.

Auto-CAD Redesign and Synchro

The five intersections were redrawn using Auto-CAD, illustrating the four-to-three lane road diet that was chosen as our final design.  Bike lanes were added onto Parkway Avenue, in both directions, allowing bicyclists to travel along the road safely.  The volumes that were obtained were inputted into Synchro, to simulate the traffic conditions of the roadway.