First Site Visit

On Monday August 24th, our team went to visit the site of the Monmouth County MA-14 Bridge.  With the help of our Industry Advisor, Joseph Strafaci, we were able to examine the structural integrity of the bridge and get a realistic view of the surrounding area.  As a result of this first site visit, our team has a better understanding of the design constraints as well as what improvements should be considered for our final design.

DSC02884   DSC02870   DSC02876   DSC02866   DSC02901