April 2018

During April, the team made improvements from the presentation in March. The verified exercise and heating components were attached to the headpiece and the remaining verification studies were completed. The IRB was accepted for validation testing. The validation studies followed the last of the verification testing. The final presentation, along with the final report, were updated and presented during the end of the month.